auto news Auto news for all makes and models.

GM Not Canceling Flint Volt Engine Plant, Just Construction Contracts

Thread Tools
 
Search this Thread
 
Rate Thread
 
Old 03-02-2009, 07:14 AM
  #1  
BRINGING IN THE NEWS!
Thread Starter
 
AutoReporter's Avatar
 
Join Date: Oct 2008
Posts: 388
Rep Power: 577
AutoReporter street rep is low. keep going
Post GM Not Canceling Flint Volt Engine Plant, Just Construction Contracts

Construction contracts for GM’s new Flint, MI engine plant have been canceled, but GM tells us plans to build the new 1.4-liter four-banger powering the Chevy Volt and Cruze in Flint remain unchanged.

Despite reports to the contrary, and despite construction contracts being canceled by GM, spokesperson Sharon Basel told us via e-mail the General’s committed to building their new 1.4-liter engine for the Chevy Volt and the turbo version for the Chevy Cruze (above) in Flint:

Additionally, Basel told the Flint News GM was examining all options — including using existing buildings on site.

Our take is GM’s looking to cut every short-term cost possible as they try to buy time until a federal solution arises to the Carpocalypse. For the moment, the most pressing vehicle to bring to market is the Chevy Volt. Given the initial low volume, GM will import 1.4-liter engines…err..range extenders from their European plant. The Chevy Cruze has been pushed off a year, so the need for the Flint engine plant to be built right now doesn’t make a whole lot of sense. Thus the delay announced late last year.

However, Flint should expect without further federal funds — or a pre-packaged bankruptcy of some sort — they won’t be seeing that plant anytime soon.



More...
AutoReporter is offline  
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
AutoReporter
auto news
0
02-26-2009 08:21 AM
AutoReporter
auto news
0
10-15-2008 12:57 AM
honda video
Honda Videos
0
03-22-2008 09:50 AM
honda video
Honda Videos
0
01-16-2008 11:14 PM

Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 


You have already rated this thread Rating: Thread Rating: 0 votes,  average.

Quick Reply: GM Not Canceling Flint Volt Engine Plant, Just Construction Contracts



All times are GMT -4. The time now is 08:16 AM.

Page generated in 0.06008 seconds with 10 queries